Manual de utilizare Rig Mat

1. Overview

Our HGM series covoare de foraj are foundation equipment made of hard pine wood and steel sections. They are primarily used for the foundation of various drilling site equipment, including substructures, mud pumps, rezervoare de nămol, camping houses, MCC houses, oil tanks, and water tanks. They ensure the stability of drilling equipment during long-term placement.

2. Technical Parameters

型号 长(mm) 宽(mm) 高(mm) 重量(kg)
HGM3220 3000 2000 200 1200
HGM4220 4000 2000 200 1600
HGM5220 5000 2000 200 2000
HGM3218 3000 2000 180 1080
HGM4218 4000 2000 180 1440
HGM5218 5000 2000 180 1800
HGM3218 3000 2000 160 960
HGM4218 4000 2000 160 1280
HGM5218 5000 2000 160 1600

3. Applicable Codes and Standards

1. SY/T 6199-2004 《Technical Requirements for Drilling Facilities Foundation》

2. GB9221-88 《Anti-corrosion Wood Sleepers》

3. SY 5305-1987 《General Technical Specifications for Welded Parts for Petroleum Drilling and Production Machinery》

4. SY/T5612-2007 《Specifications for Solids Control Equipment for Petroleum Drilling Fluids》

5. JB/T 5000.12-2007 《General Technical Specifications for Heavy Machinery – Painting》

6. GB/T13306-91 《Signage Standards》

4. Structural Composition

This rig mat  primarily consists of a steel frame, intermediate square timbers, edge timbers, and round steel reinforcements. See the diagram below.

saltea de foraj

1. Steel frame 2. Middle timber 3. Edge timber 4. Round steel reinforcement

5. Installation Steps

Step 1: Lay the First Foundation Step 2: Place the second foundation horizontally, and align the second foundation male buckle with the first foundation female buckle.
Step 3: Adjust the gap and insert the locating pin from the notch of the first female buckle Step 4: Place the third foundation on top of the first foundation. In addition, align the third female buckle and the first male buckle, and insert the locating pin.
Step 5: Place the fourth foundation vertically on the end face of the first foundation, align the male buckle end face of the fourth foundation with the female buckle end face of the first foundation, and insert the locating pin. Step 6: Place the fifth foundation vertically on the end face of the first foundation, align the end face of the fifth foundation female buckle with the end face of the first foundation male buckle, and insert the positioning pin.

The above are the installation steps for the covoare de foraj. For disassembly, follow the reverse procedure.

6. Maintenance

6.1 Do not use a high-pressure water jet to wash the foundation!

6.2 Do not hoist the foundation while carrying loads!

6.3 Before laying the foundation, the site must be leveled and compacted with a roller.

6.4 After each move and disassembly, inspect the foundation’s anti-corrosion coating. If any coating has fallen off, reapply it promptly.

6.5 If the wood is damaged or broken after a period of use, contact the manufacturer for replacements and install the timber under the manufacturer’s guidance.

Contactați-ne

Vânzări: HL Solids Control

E-mail: [email protected]