The HDD Mud Recycling System (short for Horizontal Directional Drilling) applies to urban municipal construction and electrified pipe network transformation. It also applies when laying communication cables, and during horizontal directional crossing construction across large and small rivers, lakes, and when you cannot demolish a building, especially in environmental protection, municipal pipe network expansion, and large pipeline river crossing projects.
HL Petroleum supply mud recycling system for CBM & HDD & TMB and Piling that need drilling mud.
Parameters of HL HDD Mud Recycling System:
| System Capacity: | 200GPM (50m³/h) | 500GPM (120m³/h) | 1000GPM (240m³/h) |
| Particle Size after Treatment: | 15~44μm | 15~44μm | 15~44μm |
| Processing Stage: | two stages | three stages | three stages |
| Total System Power: | 44kW | 150kW | 184kW |
| Total System Volume: | 5m³ | 15m³ | 30m³ |
| External Dimensions of the System: | 4000x2360x2940mm | 10000×2360×4228mm | 12100×2630×4438mm |
Technical Features:
1. Can effectively control drill fluids performance, reduce the drill-jamming accidents and improve pore-forming quality;
2. Can save bentonite and barite; drastically reduce the waste mud transportation cost;
3. The effective separation of soil slag by equipment will help to improve pore-forming efficiency;
4. The slurry closed cycle purification mode and lower slag moisture content reduce the impacts to the environment;
5. Safe and easy operation, simple maintenance, stable and reliable operation.
6. Reasonable design with compact structure and small footprint.

Contact Us
Sales: HL Solids Control
E-mail: [email protected]






