Installation and Removal of the Screen for the HDZS6216 Shale Shaker Frame
Screen Installation 1. Install the screen sealing frame. 2. Install the first screen 3. Align with the locking mechanism of the first screen 4. Slide in the second screen 5. Install the fourth screen following the steps above 6. Insert the wedge block into the screen and press it tight 7. Install the gear and […]
Installation and Removal of the Screen for the HDZS6216 Shale Shaker Frame Read More »





